Z5
Internal Facility Signage
12 sign mockups — 131 Heartland Blvd, Edgewood NY & 2500 Freeland Rd, Hermitage PA
Realistic printed-sign mockups. Safety color coding: red = danger, yellow = caution, green = safe passage, blue = mandatory.
Est. 2019
GLOBAL FOOD SOLUTIONS, INC.
131 Heartland Blvd Edgewood, NY 11717
MON–FRI 6:00 AM – 6:00 PM
Building Exterior — Main Entrance
VISITORS MUST CHECK IN
AT RECEPTION DESK
GLOBAL FOOD SOLUTIONS
Reception / Lobby
-18°C / 0°F
FROZEN STORAGE
PROTECTIVE GEAR REQUIRED
Temperature Zone — Frozen
2–4°C / 35–39°F
REFRIGERATED
COLD CHAIN — MAINTAIN TEMP
Temperature Zone — Refrigerated
18–22°C / 64–72°F
DRY STORAGE
AMBIENT TEMPERATURE
Temperature Zone — Dry / Ambient
PPE REQUIRED BEYOND THIS POINT
HARD HAT • HAIR NET • SAFETY VEST
PPE Required
ALLERGEN ZONE
DAIRY
Notify supervisor before entering
Allergen Warning — Dairy
AUTHORIZED PERSONNEL ONLY
RESTRICTED AREA
No Unauthorized Entry
WASH HANDS BEFORE ENTERING PRODUCTION AREA
20 SECONDS MINIMUM
Hand Washing Station
Fire Extinguisher Location
AA3
Process Flow Diagrams
Operational and food safety process flows for GFS facilities
Receiving Inspection Flow
↓
Return to Vendor
REJECT PATH
→
HACCP Critical Control Points
CCP1
Hazard: Biological
Limit: ≤ 40°F / 4.4°C
Monitor: IR thermometer on every load
CCP2
Hazard: Biological
Limit: ≤ 38°F / 3.3°C
Monitor: Continuous temp logger Q4hr
CCP3
Hazard: Physical/Chemical
Limit: Metal det. ≤2.5mm
Monitor: Inline detector every unit
CCP4
Hazard: Biological
Limit: Seal integrity 100%
Monitor: Visual + pressure test Q30min
CCP5
Hazard: Biological
Limit: ≤ 40°F / 4.4°C
Monitor: Pre-cool verify + load temp log
Process flows built with CSS flex/grid. Decision diamonds indicate approval gates. HACCP diagram shows all five critical control points with monitoring requirements per FDA 21 CFR 120.
AA4
Technology Architecture
GFS system architecture — layered infrastructure and data flow diagram
GFS Technology Architecture
v10.0 / May 2026
Channels
Web Portal
Customer Facing
Application
NetSuite ERP
Orders / Finance
Data
Cloudflare D1
Edge Database
Infrastructure
IoT Sensors
Temp / Humidity
Layered architecture diagram showing channels, application, data, and infrastructure tiers with dashed connection indicators between layers.
Z7
Warehouse Floor Plan
Edgewood facility top-down layout — 131 Heartland Blvd
Top-down SVG diagram of the Edgewood facility. Color-coded by temperature zone. Approximate dimensions shown.
GFS Edgewood — Floor Plan
131 Heartland Blvd, Edgewood NY 11717
RECEIVING
R1
4 Dock Doors
100' x 100'
R1
R2
R3
R4
SHIPPING
4 Dock Doors
100' x 100'
S1
S2
S3
S4
FROZEN STORAGE
-18C / 0F
200' x 200'
REFRIGERATED
2-4C / 35-39F
220' x 200'
DRY STORAGE
18-22C / 64-72F
180' x 200'
QUALITY LAB
180' x 110'
Testing / Inspection
OFFICE AREA
240' x 110'
Admin / Sales / IT
BREAK ROOM
180' x 110'
Cafeteria / Lockers
MAIN ENTRY
LEGEND
Frozen (-18C)
Refrigerated (2-4C)
Dry / Ambient
Quality Lab
Office
Break Room
Dock Area
Z8
Equipment Inventory
Key facility equipment across Edgewood & Hermitage
Equipment register for both GFS facilities. Service dates and status tracked for preventive maintenance scheduling.
Equipment Register
As of May 17, 2026
Equipment
Qty
Location
Last Service
Status
Walk-in Freezers
3
Edgewood (2), Hermitage (1)
Apr 15, 2026
Operational
Walk-in Coolers
4
Edgewood (3), Hermitage (1)
Apr 18, 2026
Operational
Forklift Fleet
6
Edgewood (4), Hermitage (2)
May 02, 2026
5 Op / 1 Maint
Pallet Jacks
12
Edgewood (8), Hermitage (4)
May 10, 2026
Operational
Label Printers
8
Edgewood (5), Hermitage (3)
May 12, 2026
Operational
Scales
4
Edgewood (3), Hermitage (1)
May 14, 2026
Operational
Z9
Emergency Procedures
Color-coded emergency response cards for GFS facilities
Emergency procedure cards posted throughout the facility. Each card is color-coded by emergency type for instant recognition.
FIRE EVACUATION
EMERGENCY PROCEDURE EP-001
EVACUATION ROUTE
WAREHOUSE
HALL
OFFICE
EXIT ASSEMBLY
1. Activate nearest fire alarm pull station
2. Call 911 and GFS Security ext. 100
3. Evacuate via nearest marked exit
4. Proceed to assembly point (parking lot A)
5. Account for all personnel via headcount
6. Do NOT re-enter until cleared by fire dept
CHEMICAL SPILL
EMERGENCY PROCEDURE EP-002
1. Evacuate immediate area (50 ft radius)
2. Alert supervisor and call ext. 100
3. Identify chemical via SDS (Safety Data Sheet)
4. Don appropriate PPE from spill kit
5. Contain spill with absorbent materials
6. Do NOT wash chemicals into floor drains
7. Document incident in GFS-FRM-006
SPILL KIT LOCATIONS: Dock area (2), Quality Lab (1), Warehouse aisle C (1), Break room (1)
POWER OUTAGE
COLD CHAIN PROTOCOL EP-003
1. Generator auto-start within 30 seconds
2. Verify all cooler/freezer units on backup power
3. Begin temp logging every 15 min (GFS-FRM-002)
4. Keep all cooler/freezer doors CLOSED
5. Contact PSEG at 1-800-436-PSEG
6. If >2 hrs: begin product transfer protocol
7. Document all temp readings for compliance
Generator Capacity
48 hrs
LOCKDOWN
EMERGENCY PROCEDURE EP-004
1. RUN — Evacuate if safe to do so
2. HIDE — Secure in nearest room, lock/barricade door
3. Silence all phones and devices
4. Stay away from windows and doors
5. Call 911 when safe to do so
6. FIGHT — Only as absolute last resort
7. Wait for all-clear from law enforcement
LOCKDOWN SAFE ROOMS: Office suite (A), Break room, Quality lab, Dock office
Z10
Visitor & Vendor Check-in
Lobby kiosk screen mockup — digital check-in system
Visiting
Select department or person...
I acknowledge the GFS Non-Disclosure Agreement and agree not to photograph, record, or share any proprietary information observed during my visit.
■ Hair net
■ Safety vest
■ Closed-toe shoes
PPE will be provided at the reception desk